Betty H. Fairfax High School

Location: 
Laveen, Arizona
Total Project Cost: 
$58 million
Size: 
345,000 SF
A&P Role: 
CMGC/CMAR

The heart of this high school campus is a beautiful 663-seat performing arts center featuring sophisticated acoustical engineering and a state-of-the-art rigging system. The comprehensive high school resembles a university campus in its design, with several standalone buildings joined by a pathway. The facilities include a gymnasium, library, cafeteria, media center, multipurpose space, and sports fields. The campus maximizes technology and environmental design to enhance the learning environment for students.