Blue Lake Wastewater Treatment Plant

This facility is comprised of four 1.6 million gallon digester tanks, a two-story 21,000-sf Digester Control Building, 500 ft of service tunnels and 5,300-sf chemical handling building tank modifications to thickening and dewatering building. Installation of pumps in the thickening and dewatering building and final stabilization building. AP installed the electrical systems and controls for all process systems that support the facility which includes pumps, heat exchangers and gas handling equipment and the HVAC.

Metropolitan Council

Industrial

Black & Veatch

Shakopee, MN

66,200 sf