Raytheon AIMS Center Phase I

  • Commercial / Office
  • Mission Critical
  • McKinney, TX
  • 184,000 SF
Location
McKinney, TX
Size
184,000 SF
Client
Raytheon Technologies, KDC Real Estate Dev & Investments
Design Partner
Corgan

Overview

This Design-Build project consisted of a 184,000-sf, ground-up manufacturing building, including 35,000-sf of second level mezzanine, 60,000-sf of office, 30,000-sf of clean rooms, firing rooms, building connectors, food service, loading dock and amenity space.

184K

SF Manufacturing Facility

30K

SF of Clean Rooms

60K

SF of Office Space

More about this project

AP utilized laser scanning of the existing structure used for multiple tie-ins to existing building façade and structure. This combination of Virtual Reality and Augmented Reality walkthroughs of design with user groups allowed for real-time feedback and design modifications. AP worked closely with RTX and their various program groups to finalize the designs and implement in the field. The value management process was continuous for over a year. Major items included a reduction totaling 40,000-sf and reconfiguring the building. The central plant was simplified from being able to support an additional future building with large expandable water cooled chillers to a smaller (1,200T) air cooled plant.

Corgan created a strong, branded atmosphere in the heart of the facility and increased overall functionality by creating zones for customer meetings and establishing a relationship to the lobby through the use of similar materials and an interactive display for Raytheon materials, products and awards. Staff and support spaces radiate out from the meeting spaces. A social lounge area has direct access to natural light and access to outdoor space.

As told by our clients

AP has become a trusted partner for us, consistently producing outstanding results, all while respecting the policies we have in place. I want to commend their hard work and dedication to see this project through to successful completion. The Raytheon team and I would like to thank AP for always delivering a job well done.

Keith Lahori

Senior Facilities Manager

Raytheon Company

Raytheon AIMS Center Phase I

McKinney, TX

AP surpassed performance expectations on this project and was able to make our building design come to life. AP was thorough and consistent in their execution and kept the entire project team aligned and motivated throughout construction. Despite multiple changes within the project requirements, AP ensured that the design was truly aligned with construction.

Michael Edwards

Project Manager

Corgan

Raytheon AIMS Center Phase I

McKinney, TX