AP completed interior scope work to Raytheon’s existing lab in building C27 on their CityLine campus, requiring the team to expand power and cool the existing operational lab environment’s infrastructure through new HVAC piping and CRAH units, providing new and recirculating existing Starline busways, expanding electrical infrastructure supporting building C27 (transformer, switchgear, UPS, generator) and providing additional chilled water support (chillers/cooling tower).

PGA of America
Frisco, TX
106,673 SF
- Commercial / Office

