Raytheon C27-2 Lab Infrastructure

  • Commercial / Office
  • Mission Critical
  • Richardson, TX
  • 48,500 SF
Location
Richardson, TX
Size
48,500 SF
Client
Raytheon

Overview

AP completed interior scope work to Raytheon’s existing lab in building C27 on their CityLine campus, requiring the team to expand power and cool the existing operational lab environment’s infrastructure through new HVAC piping and CRAH units, providing new and recirculating existing Starline busways, expanding electrical infrastructure supporting building C27 (transformer, switchgear, UPS, generator) and providing additional chilled water support (chillers/cooling tower).