The TD Ameritrade Data Center project included the renovation of approximately 14,000 square feet of interior office space and the construction of a new 10,000 square foot data hall designed to support 2.4 MW of IT load with 2N electrical redundancy. The project also delivered updated workplace and operational spaces, including new bathrooms, offices, conference rooms, break areas, and point of presence (PoP) rooms, along with security offices, a testing and engineering lab, and rack build areas. Electrical infrastructure included two new and two existing 2,500 kVA utility transformers, four 2,000 kW generators, transfer switches, permanent load bank gear, and four sets of paralleled lithium-ion–fed 750 kVA UPS modules, along with associated switchboards, PDUs, and busway systems.